1.Safe standing position
In the hoisting operation, under the boom, under the hoist, the hoisted object lifting front area, guide pulley steel rope triangle, fast rope around, standing in the diagonal pull of the hook or guide pulley force direction, etc. are very dangerous, a and the occurrence of danger is extremely difficult to avoid. Therefore, the staff’s standing position is very important, not only their own attention at all times, but also need to remind each other, check the implementation, in case of unpredictable.
- Correct cognitive sling safety factor
In the lifting operation, the staff does not have the correct cognition of the safety coefficient of the sling, and often takes the basis of using constantly, resulting in the overweight operation is always in a dangerous state.
- Demolition operation must have foresight to encounter various factors
For example: the estimated weight of the object, the thoroughness of the cutting, the increased load of the demolition parts by extrusion, the forced lifting of the connection parts without inspection, etc.
- Eliminate erroneous operation
Hoisting operation is not the same as many constructions, involving a large surface, often using different units and different types of cranes. Daily operating habits, performance, command signal differences and other factors are likely to trigger misoperation, so be especially careful.
- To be lifted object tying must be firm
When aerial lifting and dismantling, the object to be lifted should be “locked” instead of “pocketed”; the sharp edges of the object to be lifted should be taken “pad” measures.
- The drum wrapping rope is not tight
Large lifting demolition, crane or motorized winch drum winding steel rope arrangement is loose, resulting in a large load of fast rope strangulation into the rope bundle, resulting in fast rope violent shaking, very easy to destabilize, the result often appears to continue to work dangerously, stop and can not stop the embarrassing situation.
7.Temporary hanging nose welding is not firm
(1)Temporary hanging nose welding strength is not enough. Here the welding strength is not enough, is due to the welding of the parent material surface corrosion, the application of welding before the removal of rust spots is not complete, resulting in the appearance of the welded meat beautiful and rich, but the actual welded meat and the parent material is not fused together, the load increases or by the impact, it will occur fracture.
(2) hanging nose force direction single. In lifting or putting down long column-shaped objects, with the change of the angle of the object, the force direction of the hanging nose is also changing, and this situation is not enough consideration in the design and welding of the hanging nose, resulting in the defective hanging nose in lifting operations suddenly break (break). This kind of situation needs to weld the vertical plate on both sides of the nose in advance, and the size and thickness of the vertical plate is designed by the technical personnel.
(3) The welding material of the lifting nose does not match with the base material and informal welder welding.
- Improper selection of lifting tools or lifting points
Set up lifting tools or with the help of pipeline, structure, etc. for lifting point lifting lack of theoretical calculation, relying on experience to estimate the lifting tools or pipeline, structure lifting load-bearing capacity is not enough or local load-bearing capacity is not enough, a destabilization, resulting in the overall collapse.
- Pulley, rope selection is unreasonable
When setting up lifting tools, due to fast rope angle change and lead to pulley and tethered pulley rope force change of awareness is insufficient, guide pulley tonnage selection is too small, tethered pulley rope selection is too thin, force after overload caused by rope broken wheel fly.
- No load sling accidentally hanging objects
There are a lot of accidents happen, lifting work has ended, when the hook with empty rope rigging running, free state of the sling hanging pull has been taken off the hook of the lifted object or other objects, operation of the driver or command staff such as the response is not timely, the instant accident will happen, and such accidents to the operator and crane with very bad consequences.
- Lifting and hoisting construction plan and the actual operation of the disconnect
The main performance is incomplete content, lack of necessary data or construction methods and the actual operating conditions do not match, so that the construction plan becomes a shield to cope with the superior inspection, and does not play a role in guiding construction.
- Air suspension for a long time without sealing safety insurance rope
Some equipment or components due to the installation process requirements, need to be suspended in the air first after fixed in place, and some suspended objects in the air stay longer, if there is no safety insurance rope, once by accidental vibration, impact or welding line and other injuries, will cause serious consequences of falling suspended objects.
- Process handover is unclear or multi-unit construction process balance has loopholes
Such as some structures or platforms on a shift dismantled but off-duty handover is not clear, Zhang San built the shed can be on the people Wang Wu do not know, A unit cut off the platform beam and B unit continue to put heavy objects on the platform, resulting in temporary support overload. The result is that the problem occurred, still do not know what is going on.
- Construction busy with progress confirmation is not enough
The crane station did not carry out the underground consultation; operation before the weight of the lifting object confirmation is not allowed and the surrounding environment of the high-voltage lines, running equipment, coal oxygen pipeline leakage points and other hidden dangers and the owner unit’s safety warning signs are not found in time and suffer big losses.
- Use the sling with “fault”
Some people in order to save trouble, looking for a rope buckle on the use, do not know that this is someone else threw the scrap of the rope buckle, some have suffered internal injuries, some partial annealing, and some let the welding hit, and these problems and problems are not easy to check out; there are also greedy for cheap to buy informal manufacturers of pulleys, rings and other unqualified spreader, so that workers work in fear. In order to ensure construction safety, please don’t use the rope buckle thrown by others, cut off the damaged and scrapped rope buckle in time to prevent others from misuse; don’t buy the spreader produced by informal manufacturers.
- Use sisal rope as safety rope
Because the bearing performance of hemp rope is far less than steel rope, and hemp rope in daily storage and use is very easy to suffer damage and reduce the tensile strength, so the use of hemp rope as a safety rope can not play a safe role, but make people produce psychological dependence caused by accidents.
- Not set up warning area
Large lifting and aerial work under the dangerous area is not set up in time to pull the safety warning area and arrange the safety guardian, leading to other people do not know the situation into the dangerous area and accidents.
- The crane long boom lifting heavy objects to “brake rod” is not well considered
When the crane long boom lifting heavy objects, due to the crane boom under the force of the “brake”, the rod head and the weight of the vertical line of gravity change, such as starting rod adjustment is not allowed, will cause the heavy lifting instant shift, such as operators do not take into account, did not take evasive measures (especially in the air), it may be an accident.
- Two cars lifting and turning an item with the same load is not allowed to count the weight
As the center of gravity in the flip in the change, if the calculation is not allowed, especially easy to lead to one of the crane overload instability and problems, this aspect if the problem occurs not only threaten the safety of people, and mechanical economic losses are huge, history has a deep lesson, need to pay special attention to the construction and technical personnel.
- Dangerous area operation without taking the necessary precautions
Such as working on the overhead crane beam, prior contact with the overhead crane driver to confirm insufficient or due to the overhead crane driver’s busy error of misoperation, because of the failure to take measures such as hanging warning flags, warning lights, set up car gear, resulting in the sudden appearance of the overhead crane, the construction staff to avoid the accident.
- Insufficient consideration of climate impact
Open-air gantry crane and other lifting equipment not installed in the gantry crane did not take reliable sealing measures, the use of suspended tower crane hook did not rise to a safe position or anchor sealed in the lighter weight, a gust of wind may cause accidents, and sometimes a sudden gust of rain to short-circuit the power supply, want to lift the hook are too late. Therefore, it is very important to develop good construction work habits. Then again, windy days large lifting must be considered wind load on the crane impact factors, there is a danger or wind more than the safety regulations do not work.
In summary, the lifting operation involves the construction organization, operation design, program development, machine selection, personnel operation skills, construction experience, collaboration and mutual protection, multi-job cooperation, environmental characteristics and climatic factors, etc. Therefore, to do a good job in the lifting operation safety work, need from construction management to personnel operation and other aspects to pay great attention to, strictly according to science.
As lifting operators, in addition to the strict implementation of the relevant provisions, but also to study the operating techniques, timely summary of lessons learned, to improve the ability to prevent accidents, in specific operations, but also pay attention to the construction experience of each person, operating skills, knowledge of the different, the dangers of lifting operations and hidden dangers of judgment is also different, so the role of mutual cooperation and mutual protection in lifting operations is particularly important. Usually also strongly advocate more than a word, more than a hand, more than a suggestion activities. Critical moment, a word, a hand, a suggestion can often be timely to avoid an accident.